Why Greenpoint-Williamsburg?

The proposed Project site has excellent attributes for a combined-cycle and cogeneration plant.  The site is heavily contaminated, and will be remediated as part of Project construction.  Other attributes of the Project site include:

bullet

Deliverability of power into the heart of the New York load pocket;

bullet

Proximity of natural gas and on-site location of oil pipeline terminal;

bullet

Proximity to NYC steam system, with deliverability to the midtown and downtown load centers;

bullet

M3 zoning, the district designated is New York City for siting power plants as of right;

bullet

Ability to deliver major equipment as well as backup fuel by barge;

bullet

Brownfield remediation opportunity; and

bullet

Commercial availability, as TGE does not have the power of eminent domain.

Home Page